Just for fun
2030:
12 stations on CRL1 opens
Changi T5 station construction begins.
Bedok General Hospital opens
Singhealth campus completes makeover
Tuas South takes shape
3 stations on Tuas South Extension begin Operation
SAFTI LIVE FIRING AREA moves to Pulau Tekong
Tengah Airbase moves to Changi
Tengah airbase conversion to an airport, Seletar T2 announced
Seletar Line (SLL) announced
Disneyland and mrt announced
Johor MRT Larkin line (LKL) opens
2031:
CRL2 opens
SLL1 begins construction
JRL West Coast Extension Opens
Pungool North LRT announced
Seletar T2 begins Construction
Tengah Airport T1 begins 2 year renovation
2032:
Minstry of Climate Change announced.
CRL3 and North Coast Line (NCL) stage 1 opens
SLL2 begins Construction.
Tampines Line (TPL) announced
NE2 Kampong Bahru announced
Green Float islands begin construction
2033:
SLL3 begins Construction
TPL begins construction
Kampong bahru begins construction
Tuas Port begins Operation
Last part of Pasir Panjang Port Closes
Southern Waterfront takes shape
Changi T5 and MRT begins operation
Tengah Airport Opens.
2034:
Pungool north LRT begins Construction
LTA revives plans for Bouna Vista LRT
Bukit Panjang LRT renamed Choa chu Kang LRT (CKLRT) East Loop.
CKLRT West loop begins construction
Brickland and Sungei Kadut open
2035:
Ministry of Climate Change launched
SpaceX announced plans to terraform Mars
Disneyland and MRT opens
Last Roadside Terminal Closes.
Bouna Vista Bus Interchange Opens.
Sims Place Bus Terminal is preserved.
Tengah T2 begins construction
Changi Satelite Terminal begins operation
Semakau Landfill runs out of space.
2036:
Pungool North LRT begins operation
CKLRT west begins operation
Bouna Vista LRT begins Operation
Brani Express Monorail begins construction
SLL1 begins Operation
Southern Waterfront completed
Plans for Sarimbun, Murai, Poyan, Pasir Laba and Peng Kang towns begin construction
TraceTogether Tokens displayed in National Museum.
Ten Mile Junction LRT renovated into 2 platform station and reopens after 17 years
2037:
SLL2 opens
TPL opens
Rail Corridor Line (RCL) announced
Sungei Kadut, Woodlands and Yishun LRT begin Construction
Pasir Panjang Hospital begins Construction
Raising of Singapore above 5m sea level begins
DTL woodlands North Extension opens
MRT celebrates 50th Anniversary
Tuas South Extension on EWL opens
CCNR designated as heritage site
Eco Links are a normal thing
Chek Jawa designated as a heritage Site
Singapore waste collection hub in Tuas begins Construction
2038:
RCL begins Construction
Tengah Airport Line (TAL) begins Construction
Brani Express opens
SLL3 opens
2039:
Sungei Kadut (SK), Woodlands (WL) and Yishun (YS) LRT begin Operation
2040:
Pasir Panjang Hospital opens
Singapore waste collection hub opens
TAL opens
Sarimbun town take shape
Poyan Line (PYL) stage 1 btwn Sungei Kadut and Sarimbun opens.
RCL opens
2041:
Murai town takes shape.
RCL Jurong pier - Bukit Timah Branch opens
NCL2 btwn Pungool and Yishun begins Operation
Queenstown tram (QT tram) btwn Clementi and Botanic Gardens begin Operation.
2042:
Poyan town takes shape.
PYL2 btwn Sarimbun and Poyan opens.
Marina BAY sands 5th Tower opens
SG average temp: 30 degrees celcius.
Flying Car Introduced
First 4 digit bus service in 24 years introduced: Bus 1000 btwn Sarimbun Bus Interchange and Tengah ITH
First Green Floats open
2043:
Pasir Laba Town takes shape
East West line extended to Pasir Laba
Govt announces plans to start 'rebuilding' older lines
2044:
Peng Kang Town takes shape
Changi T6 opens
More land reclaimed for Changi
Changi Skytrain Rebuilt
North And South PMS linked
Tuas - Nusajaya RTS opens
2045:
Chou Chous added onto UNESCO world heritage list
297 year old Tembusu tree designated as a extra care plant
The great reclamation 2045 begins
No comments:
Post a Comment